Wind energy, Peralta, Uruguay


Uruguay, Peralta
ClimatePartner ID: 1083
Wind energyGet to know the project

A wind farm project near by the Uruguayan village of Peralta saves carbon emissions by replacing fossil fuel-based electricity with clean renewable energy. Comprising 25 turbines with a total capacity of 50 MW, the wind park generates an average of 120,000 MWh annually - which corresponds to the demand of 50,000 Uruguayan households. The project contributes to further increasing the share of renewables in the country's national grid. In 2015 this share already exceeded 94%, with 17% coming from wind energy. Carbon finance thus supports Uruguay's ambition to become carbon neutral by 2030. The project has also brought modern wind power technology and the related knowledge to the region. As a positive example it promotes increasing investments in renewable energies.

To prevent negative environmental impacts in the surrounding area, avian and bat monitorings are performed quarterly by qualified staff. The wind farm has been recognized as a pioneer project by Harvard University’s Zofnass Program for Sustainable Infrastructure.

91,700 t CO₂Estimated annual emissions reductions
Project Standard
The project contributes to the the United Nations' Sustainable Development Goals
How wind energy contributes to climate action

As the name suggests, wind turbines use the power of the wind to generate energy. During this process, a generator located inside the wind turbine converts kinetic energy into electrical energy. As energy is still mainly generated from fossil fuels in many areas around the world, clean wind energy can replace some of this fossil, high-emission energy and verifiably save CO2 emissions.

In most cases, the sustainably generated electricity from the wind power projects is fed into a regional power grid, which diversifies the power supply and improves energy security in regions that are frequently affected by power shortages and outages. A project often creates increased job opportunities for the local population and the area can be used for additional activities, such as agriculture. Wind power projects make an important contribution to a clean energy supply worldwide and contribute to sustainable development with respect to the UN Sustainable Development Goals (SDGs). Wind energy projects in the ClimatePartner portfolio are registered with international standards.

The project aims to contribute to these United Nations’ Sustainable Development Goals (SDGs).

Project facts

Climate projects generally fall into one of three groups: carbon reduction, carbon removal, or carbon avoidance. Carbon reduction projects reduce the amount of greenhouse gas emissions produced by a specific activity (e.g., improved cookstoves). Carbon removal projects remove carbon from the atmosphere by sequestering it in carbon sinks (e.g., reforestation). Carbon avoidance projects avoid greenhouse gas emissions entering the atmosphere (e.g., protecting forests from deforestation with REDD+ projects).

All climate projects are based on international standards. They set processes and requirements which carbon projects must fulfill to be recognised as a proven method of reducing carbon emissions.

Climate projects demonstrably reduce, remove, or avoid greenhouse gas emissions. This is achieved with various technologies, ranging from nature-based solutions to social impact projects and renewable energies.

Climate projects go through third-party validation and verification. Verification happens regularly after each monitoring period. A validation and verification body checks and assesses whether the values and project activities stated in the monitoring report are correct and verifies them. As with validation, visits to the project site are often part of the process.

This figure shows the estimated annual emission reductions calculated before the project started. The actual number of emissions saved in each monitoring period may differ. The background to this process is that in order to be registered as a climate project, the project operator must submit the calculation of the estimated emissions savings using the ex-ante methodology in a Project Design Document (PDD), which is similar to a business plan. This calculation is validated by an independent auditor. The values determined in the PDD are recalculated during regular monitoring periods based on actual project performance, documented in a monitoring report, and verified again by independent auditors at the end of the monitoring period to ensure a robust process. Independent verification thus provides ex-post verification of actual emission reductions. Verified emission reductions are not distributed until the savings have actually been made.