The project sites are located at Villages Anabaru and Arasinagundi in the Jagalur Taluk in the district of Davangere, in the Indian state of Karnataka. 18 Wind Turbines of 1.65 MW capacity each totaling 29.70 MW are spread over two locations in the State of Karnataka, belonging to the one wind farm. The project activity involves the development and operation of wind based electricity generation facilities which are connected to the grid.

The generated electricity will be fed into the state grid for a period of 20 years. This pilot project is the first of its kind to use underground transmission lines, which is 8 times safer for the environment. It is the first of its kind to use the SCADA system which improves the project infrastructure by supporting water treatment and distribution, minimizing waste water and loss of oil and gas to make an even more energy efficient project.

88,240 t CO₂Estimated annual emissions reductions
Project Standard
The project contributes to the the United Nations' Sustainable Development Goals
How wind energy contributes to climate action

As the name suggests, wind turbines use the power of the wind to generate energy. During this process, a generator located inside the wind turbine converts kinetic energy into electrical energy. As energy is still mainly generated from fossil fuels in many areas around the world, clean wind energy can replace some of this fossil, high-emission energy and verifiably save CO2 emissions.

In most cases, the sustainably generated electricity from the wind power projects is fed into a regional power grid, which diversifies the power supply and improves energy security in regions that are frequently affected by power shortages and outages. A project often creates increased job opportunities for the local population and the area can be used for additional activities, such as agriculture. Wind power projects make an important contribution to a clean energy supply worldwide and contribute to sustainable development with respect to the UN Sustainable Development Goals (SDGs). Wind energy projects in the ClimatePartner portfolio are registered with international standards.

The project aims to contribute to these United Nations’ Sustainable Development Goals (SDGs).

Project facts

Climate projects generally fall into one of three groups: carbon reduction, carbon removal, or carbon avoidance. Carbon reduction projects reduce the amount of greenhouse gas emissions produced by a specific activity (e.g., improved cookstoves). Carbon removal projects remove carbon from the atmosphere by sequestering it in carbon sinks (e.g., reforestation). Carbon avoidance projects avoid greenhouse gas emissions entering the atmosphere (e.g., protecting forests from deforestation with REDD+ projects).

All climate projects are based on international standards. They set processes and requirements which carbon projects must fulfill to be recognised as a proven method of reducing carbon emissions.

Climate projects demonstrably reduce, remove, or avoid greenhouse gas emissions. This is achieved with various technologies, ranging from nature-based solutions to social impact projects and renewable energies.

Climate projects go through third-party validation and verification. Verification happens regularly after each monitoring period. A validation and verification body checks and assesses whether the values and project activities stated in the monitoring report are correct and verifies them. As with validation, visits to the project site are often part of the process.

Climate projects go through third-party validation and verification. Validation happens early in the project life cycle and ensures that the project design is in line with current processes and requirements. This phase often also involves field visits with on-site interviews and analyses. Auditors are accredited, impartial assessors who have to be approved as a validation and verification body (VVB) by the standards body.

This figure shows the estimated annual emission reductions calculated before the project started. The actual number of emissions saved in each monitoring period may differ. The background to this process is that in order to be registered as a climate project, the project operator must submit the calculation of the estimated emissions savings using the ex-ante methodology in a Project Design Document (PDD), which is similar to a business plan. This calculation is validated by an independent auditor. The values determined in the PDD are recalculated during regular monitoring periods based on actual project performance, documented in a monitoring report, and verified again by independent auditors at the end of the monitoring period to ensure a robust process. Independent verification thus provides ex-post verification of actual emission reductions. Verified emission reductions are not distributed until the savings have actually been made.