Protection of the Amazon and new opportunities for the local population


Brazil, Pará
ClimatePartner ID: 1717
Forest protectionGet to know the project

In Brazil, around 60% of the country's land area is covered by forests (Global Forest Watch).

Nevertheless, the country is one of the global deforestation hotspots: between 2010 and 2020, nearly 15 million hectares of forest were lost.

The pressure on forests is particularly high in the state of Pará, driven primarily by illegal logging and extensive cattle ranching. Massive deforestation not only destroys valuable habitats but also releases large amounts of greenhouse gases, thus accelerating climate change.

This is where this climate project comes in. Its goal is to protect 140,110 hectares of rainforest and prevent deforestation through a three-pronged approach of forest protection measures, social programs, and sustainable forest management.

The project area is regularly patrolled by trained forest rangers, and satellite monitoring is used to detect vegetation changes at an early stage. A Sustainable Forest Management Plan (SFMP) ensures that timber is harvested only in strictly limited quantities and also requires reforestation and restoration of degraded areas.

A central component of the project is the active involvement of the local population. By developing fish farming facilities, vegetable gardens, and introducing agroforestry systems, alternative sources of income are created. This helps ensure that the livelihoods of local communities are not dependent on deforestation.

In addition to economic benefits, the project also brings social improvements:

  • The project donates books and games to the local library.

  • It improves access to medical care by distributing medicines and providing health consultations.

  • Workshops for women and young people, such as floristry, jewelry-making, and painting, lay the foundation for new sources of income.

The project makes an important contribution to protecting endangered species.

Studies document the presence of threatened species in the project area and form the basis for targeted conservation strategies – including for the jaguar, the black-faced emperor tamarin, and the green-winged trumpeter.

1,003,969 t CO₂Estimated annual emissions reductions
VCS, CCBS
Project Standard
The project contributes to the the United Nations' Sustainable Development Goals
How does forest protection help fight global warming?

Forests are not only among the planet's most important carbon reservoirs. They also are home to an enormous diversity of species and are the livelihood for all people. However, global forest areas have declined sharply in recent decades due to increasing settlement, agricultural use, illegal logging and mining.

Forest protection projects ensure that forests are preserved in the long term and that the protection of forests is given a higher value than their deforestation. Together with the local population, project participants protect the area from negative influences. To allow for this the projects create alternative sources of income and educational opportunities. Depending on the project region, forests store varying amounts of carbon per hectare. Particularly high amounts of carbon are stored in the vegetation and soil of tropical swamp forests, primary rainforests, or mangroves. Forest protection projects in the ClimatePartner portfolio are registered with international standards.

The project aims to contribute to these United Nations’ Sustainable Development Goals (SDGs).

No Poverty
Zero Hunger
Good Health and Well-Being
Quality Education
Gender Equality
Clean Water and Sanitation
Decent Work and Economic Growth
Responsible Consumption and Production
Climate Action
Life on Land
The project aims to contribute to these United Nations’ Sustainable Development Goals (SDGs).
Project facts

Climate projects generally fall into one of three groups: carbon reduction, carbon removal, or carbon avoidance. Carbon reduction projects reduce the amount of greenhouse gas emissions produced by a specific activity (e.g., improved cookstoves). Carbon removal projects remove carbon from the atmosphere by sequestering it in carbon sinks (e.g., reforestation). Carbon avoidance projects avoid greenhouse gas emissions entering the atmosphere (e.g., protecting forests from deforestation with REDD+ projects).

All climate projects are based on international standards. They set processes and requirements which carbon projects must fulfill to be recognised as a proven method of reducing carbon emissions.

Climate projects demonstrably reduce, remove, or avoid greenhouse gas emissions. This is achieved with various technologies, ranging from nature-based solutions to social impact projects and renewable energies.

Climate projects go through third-party validation and verification. Verification happens regularly after each monitoring period. A validation and verification body checks and assesses whether the values and project activities stated in the monitoring report are correct and verifies them. As with validation, visits to the project site are often part of the process.

Climate projects go through third-party validation and verification. Validation happens early in the project life cycle and ensures that the project design is in line with current processes and requirements. This phase often also involves field visits with on-site interviews and analyses. Auditors are accredited, impartial assessors who have to be approved as a validation and verification body (VVB) by the standards body.

This figure shows the estimated annual emission reductions calculated before the project started. The actual number of emissions saved in each monitoring period may differ. The background to this process is that in order to be registered as a climate project, the project operator must submit the calculation of the estimated emissions savings using the ex-ante methodology in a Project Design Document (PDD), which is similar to a business plan. This calculation is validated by an independent auditor. The values determined in the PDD are recalculated during regular monitoring periods based on actual project performance, documented in a monitoring report, and verified again by independent auditors at the end of the monitoring period to ensure a robust process. Independent verification thus provides ex-post verification of actual emission reductions. Verified emission reductions are not distributed until the savings have actually been made.

Four criteria for projects to meet quality thresholds

01. AdditionalityA project must lead to lower carbon emissions than would have occured without the project. Additionality also means that a project relies on financing from the sale of emission reductions, as the project would otherwise not be feasible and the upfront investment would be too high for project developers.
02. Exclusion of double countingThe carbon reduction may only be counted once and may not be counted again elsewhere, so a Verified Emission Reduction is retired once it has been used. This process is recorded in official registries.
03. PermanenceThe criterion of permanence ensures that carbon reductions or removals are ongoing and do not occur just once. This guarantees a long-term benefit for the climate. The minimum duration of a project depends on the underlying project technology.
04. Audit by independent third-partiesClimate projects must be audited regularly by independent auditors such as TÜV Nord. These auditors verify that the project is in compliance with the relevant standards. They also determine the volume of carbon emissions that have actually been avoided or removed.

The life cycle of a climate project

A climate project has a set life cycle consisting of various phases, from the feasibility assessment to the retirement of Verified Emission Reductions (VERs).
Project planning phase

The project developer reviews the general feasibility of the project, the project design, and the financing. Then, the Project Design Document (PDD) is prepared, which contains all the basic information about the project, such as the objective, location, timeline, and duration.

Validation

In this phase, independent auditors examine the PDD and the information it contains. This phase often also involves field visits with on-side interviews and analyses. Auditors are accredited, impartial assessors who have to be approved by the relevant standard as a validation and verification body (VVB). TÜV Nord/Süd, S&A Carbon LLC., and SCS Global Services are examples of VVBs."

Registration

Once validated, the project can be registered with a standard such as the Verified Carbon Standard or the Gold Standard. All high-quality climate projects are based on international standards. They provide the framework for project design, construction, carbon accounting, and monitoring. Recognised standards make the climate project system and the projects themselves resilient, traceable, and credible.

Monitoring

After the climate project has been registered, the monitoring begins. Here, the project developers monitor and document the data of the project activities and progress. The duration of the monitoring phase varies from project to project: it can cover two years, but documentation over five or seven years is also possible.

Verification

At the end of each monitoring phase, a VVB checks and assesses whether the values and project activities stated in the monitoring report are correct. As with validation, visits to the project site are often part of the verification process.

Issuance of Verified Emission Reductions

Once verified, the emission reductions that were confirmed in the verification phase can be issued as VERs. The steps of monitoring, verification, and issuance of VERs are repeated regularly and are therefore considered as a cycle.

Retirement of Verified Emission Reductions

Once a VER has been used, it must be retired. This process is also reflected in the registry. If the financing of a climate project is done through ClimatePartner, the VERs are bundled in a system certified by TÜV Austria and then retired on a regular basis. This ensures that each VER can no longer be sold and is only used once, preventing double counting.