Wind energy replaces fossil fuel-based grid electricity in Gujarat
India’s electricity grid continues to rely heavily on fossil fuel-based power plants. As a result, electricity generation causes substantial CO2 emissions. Expanding renewable energy helps meet a growing share of electricity demand with wind and solar power and reduces dependence on fossil fuels.
This is where the wind energy project in the districts of Jamnagar and Rajkot in the western Indian state of Gujarat comes in. It comprises twelve wind turbines with a total installed capacity of 9.6 MW. Each turbine has a capacity of 800 kW. The turbines convert the kinetic energy of the wind into electricity and feed it into the Indian electricity grid.
The wind power replaces electricity that, without the project, would largely have been generated by fossil fuel-based power plants connected to the grid. For the second crediting period, average electricity generation of approximately 17,860 MWh per year is expected.
The project’s climate impact results from replacing this fossil fuel-based grid electricity. The wind energy project is estimated to reduce CO2 emissions by approximately 16,692 tonnes per year on average.
The latest verified results confirm the project’s electricity generation. From 1 April 2022 to 31 March 2025, the twelve wind turbines fed a total of 39,356.25 MWh of renewable electricity into the public grid. The electricity supplied to the grid is measured continuously and documented monthly.
In addition to its climate impact, the project creates jobs. Personal protective equipment and training on occupational health and safety contribute to safe working conditions.
As the name suggests, wind turbines use the power of the wind to generate energy. During this process, a generator located inside the wind turbine converts kinetic energy into electrical energy. As energy is still mainly generated from fossil fuels in many areas around the world, clean wind energy can replace some of this fossil, high-emission energy and verifiably save CO2 emissions.
In most cases, the sustainably generated electricity from the wind power projects is fed into a regional power grid, which diversifies the power supply and improves energy security in regions that are frequently affected by power shortages and outages. A project often creates increased job opportunities for the local population and the area can be used for additional activities, such as agriculture. Wind power projects make an important contribution to a clean energy supply worldwide and contribute to sustainable development with respect to the UN Sustainable Development Goals (SDGs). Wind energy projects in the ClimatePartner portfolio are registered with international standards.
Four criteria for projects to meet quality thresholds
The life cycle of a climate project
A climate project has a set life cycle consisting of various phases, from the feasibility assessment to the retirement of Verified Emission Reductions (VERs).The project developer reviews the general feasibility of the project, the project design, and the financing. Then, the Project Design Document (PDD) is prepared, which contains all the basic information about the project, such as the objective, location, timeline, and duration.
In this phase, independent auditors examine the PDD and the information it contains. This phase often also involves field visits with on-side interviews and analyses. Auditors are accredited, impartial assessors who have to be approved by the relevant standard as a validation and verification body (VVB). TÜV Nord/Süd, S&A Carbon LLC., and SCS Global Services are examples of VVBs."
Once validated, the project can be registered with a standard such as the Verified Carbon Standard or the Gold Standard. All high-quality climate projects are based on international standards. They provide the framework for project design, construction, carbon accounting, and monitoring. Recognised standards make the climate project system and the projects themselves resilient, traceable, and credible.
After the climate project has been registered, the monitoring begins. Here, the project developers monitor and document the data of the project activities and progress. The duration of the monitoring phase varies from project to project: it can cover two years, but documentation over five or seven years is also possible.
At the end of each monitoring phase, a VVB checks and assesses whether the values and project activities stated in the monitoring report are correct. As with validation, visits to the project site are often part of the verification process.
Once verified, the emission reductions that were confirmed in the verification phase can be issued as VERs. The steps of monitoring, verification, and issuance of VERs are repeated regularly and are therefore considered as a cycle.
Once a VER has been used, it must be retired. This process is also reflected in the registry. If the financing of a climate project is done through ClimatePartner, the VERs are bundled in a system certified by TÜV Austria and then retired on a regular basis. This ensures that each VER can no longer be sold and is only used once, preventing double counting.
Explore our projects
Biochar for Climate Action, Healthy Soils, and Better Harvests

A certified climate project combined with additional commitment

Expansion of renewable energy generation in Asia

Ceramic water filters save CO2 and improve health

Improved cookstoves worldwide – for better health and cleaner air

A certified climate project combined with additional commitment

Powering access to renewable energy in Africa

A certified climate project combined with additional commitment

Restored ecosystems remove carbon

Turning degraded farmlands into healthy ecosystems

Improved cookstoves - better for health and the environment