Solar energy replaces fossil fuel-based grid electricity


Turkey, Holoşnut
ClimatePartner ID: 1777
Solar energyGet to know the project

Turkey is expanding its renewable energy supply. Nevertheless, part of its electricity continues to be generated by fossil fuel-based power plants. Solar energy can replace this electricity generation and reduce the associated CO2 emissions.

This is where the solar project near the village of Şahinkaya in the eastern Turkish province of Elazığ comes in. The three photovoltaic plants have a combined installed capacity of 9 MW. They convert sunlight into electricity, which is fed into the Turkish electricity grid via a substation.

The solar power replaces electricity that would otherwise be generated by other power plants connected to the grid. For the second crediting period, average electricity generation of approximately 15,496 MWh per year is expected.

The project’s climate impact results from replacing grid electricity that would otherwise have been generated by fossil fuel-based power plants. The solar project is estimated to avoid approximately 9,702 tonnes of CO2 per year on average.

In addition to its climate impact, the project creates employment at the plant site. During the most recent verified monitoring period, four people worked for the project, two of whom came from the local region. During this period, the employees participated in a total of six training sessions.

The project therefore combines the expansion of renewable energy with local employment. The solar plants generate electricity without using fossil fuels and help reduce emissions from Turkey's electricity system.

9,702 t CO₂Estimated annual emissions reductions
Gold Standard
Project Standard
The project contributes to the the United Nations Sustainable Development Goals
How does solar energy contribute to climate action?

Although the development of renewable energy sources is increasing, energy from fossil fuels is still a significant part of energy production worldwide. This is associated with the release of large amounts of carbon emissions. The use of solar energy is a good way to provide people around the world with renewable energy and reduce greenhouse gas emissions. Solar installations, implemented through solar projects, convert sunlight into electricity (photovoltaic) or heat (solar thermal). Even when the sky is cloudy, the solar thermal power plants generate heat and convert it into electricity. Photovoltaic projects use the photoelectric effect to convert sunlight into electricity.

The energy produced is typically fed into the national or regional power grid, reducing the share of fossil fuels in the electricity mix. In addition to reducing carbon emissions, solar projects also prevent the release of various pollutants associated with conventional power generation. Solar energy projects in the ClimatePartner portfolio are registered with international standards.

The project aims to contribute to these United Nations Sustainable Development Goals (SDGs).

Affordable and Clean Energy
Decent Work and Economic Growth
Climate Action
The project aims to contribute to these United Nations Sustainable Development Goals (SDGs).
Project facts

Climate projects generally fall into one of three groups: carbon reduction, carbon removal, or carbon avoidance. Carbon reduction projects reduce the amount of greenhouse gas emissions produced by a specific activity (e.g., improved cookstoves). Carbon removal projects remove carbon from the atmosphere by sequestering it in carbon sinks (e.g., reforestation). Carbon avoidance projects avoid greenhouse gas emissions entering the atmosphere (e.g., protecting forests from deforestation with REDD+ projects).

All climate projects are based on international standards. They set processes and requirements which carbon projects must fulfill to be recognised as a proven method of reducing carbon emissions.

Climate projects demonstrably reduce, remove, or avoid greenhouse gas emissions. This is achieved with various technologies, ranging from nature-based solutions to social impact projects and renewable energies.

Climate projects go through third-party validation and verification. Verification happens regularly after each monitoring period. A validation and verification body checks and assesses whether the values and project activities stated in the monitoring report are correct and verifies them. As with validation, visits to the project site are often part of the process.

Climate projects go through third-party validation and verification. Validation happens early in the project life cycle and ensures that the project design is in line with current processes and requirements. This phase often also involves field visits with on-site interviews and analyses. Auditors are accredited, impartial assessors who have to be approved as a validation and verification body (VVB) by the standards body.

This figure shows the estimated annual emissions reductions calculated before the project started. Actual reductions in each monitoring period may differ. To be registered as a climate project, the project developer must submit the estimate using the ex-ante methodology in a Project Design Document (PDD), which is similar to a business plan, and an independent auditor validates it. In each monitoring period, the developer recalculates the figures based on the project’s actual performance and documents them in a monitoring report, which independent auditors then verify. VERs are only issued for reductions that have actually taken place.

Four criteria for projects to meet quality thresholds

01. AdditionalityA project must lead to lower carbon emissions than would have occured without the project. Additionality also means that a project relies on financing from the sale of emission reductions, as the project would otherwise not be feasible and the upfront investment would be too high for project developers.
02. Exclusion of double countingThe carbon reduction may only be counted once and may not be counted again elsewhere, so a Verified Emission Reduction is retired once it has been used. This process is recorded in official registries.
03. PermanenceThe criterion of permanence ensures that carbon reductions or removals are ongoing and do not occur just once. This guarantees a long-term benefit for the climate. The minimum duration of a project depends on the underlying project technology.
04. Audit by independent third-partiesClimate projects must be audited regularly by independent auditors such as TÜV Nord. These auditors verify that the project is in compliance with the relevant standards. They also determine the volume of carbon emissions that have actually been avoided or removed.

The life cycle of a climate project

A climate project has a set life cycle consisting of various phases, from the feasibility assessment to the retirement of Verified Emission Reductions (VERs).
Project planning phase

The project developer reviews the general feasibility of the project, the project design, and the financing. Then, the Project Design Document (PDD) is prepared, which contains all the basic information about the project, such as the objective, location, timeline, and duration.

Validation

In this phase, independent auditors examine the PDD and the information it contains. This phase often also involves field visits with on-side interviews and analyses. Auditors are accredited, impartial assessors who have to be approved by the relevant standard as a validation and verification body (VVB). TÜV Nord/Süd, S&A Carbon LLC., and SCS Global Services are examples of VVBs."

Registration

Once validated, the project can be registered with a standard such as the Verified Carbon Standard or the Gold Standard. All high-quality climate projects are based on international standards. They provide the framework for project design, construction, carbon accounting, and monitoring. Recognised standards make the climate project system and the projects themselves resilient, traceable, and credible.

Monitoring

After the climate project has been registered, the monitoring begins. Here, the project developers monitor and document the data of the project activities and progress. The duration of the monitoring phase varies from project to project: it can cover two years, but documentation over five or seven years is also possible.

Verification

At the end of each monitoring phase, a VVB checks and assesses whether the values and project activities stated in the monitoring report are correct. As with validation, visits to the project site are often part of the verification process.

Issuance of Verified Emission Reductions

Once verified, the emission reductions that were confirmed in the verification phase can be issued as VERs. The steps of monitoring, verification, and issuance of VERs are repeated regularly and are therefore considered as a cycle.

Retirement of Verified Emission Reductions

Once a VER has been used, it must be retired. This process is also reflected in the registry. If the financing of a climate project is done through ClimatePartner, the VERs are bundled in a system certified by TÜV Austria and then retired on a regular basis. This ensures that each VER can no longer be sold and is only used once, preventing double counting.